impermanence #32

Open
sarahlament wants to merge 2 commits from impermanence into main
Owner
  • initial wiring for impermanence
    • this is getting shelved for now, but figured I'd stage it here anyways
- initial wiring for impermanence - this is getting shelved for now, but figured I'd stage it here anyways
shelved until migration
Some checks failed
CI / check (pull_request) Failing after 5s
CI / deploy (athena) (pull_request) Has been skipped
CI / build (athena) (pull_request) Has been skipped
CI / build (ishtar) (pull_request) Has been skipped
CI / dry-activate (athena) (pull_request) Has been skipped
CI / dry-activate (ishtar) (pull_request) Has been skipped
CI / deploy (ishtar) (pull_request) Has been skipped
90d47b120f
Some checks failed
CI / check (pull_request) Failing after 5s
Required
Details
CI / deploy (athena) (pull_request) Has been skipped
CI / build (athena) (pull_request) Has been skipped
Required
Details
CI / build (ishtar) (pull_request) Has been skipped
Required
Details
CI / dry-activate (athena) (pull_request) Has been skipped
Required
Details
CI / dry-activate (ishtar) (pull_request) Has been skipped
Required
Details
CI / deploy (ishtar) (pull_request) Has been skipped
This pull request has changes conflicting with the target branch.
  • modules/diskoConfigurations/athena.nix
  • modules/nixosModules/hardware/linodeBase.nix
  • modules/nixosModules/system/impermanence.nix
View command line instructions

Manual merge helper

Use this merge commit message when completing the merge manually.

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin impermanence:impermanence
git switch impermanence
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
sarahlament/nix-configurations!32
No description provided.